MIL-DTL-17557F(SH)
3.3 Welding and allied processes. Welding shall be in accordance with S9074-AR-GIB-010/278. Brazing
shall be in accordance with 0900-LP-001-7000, except that requirements for use of pre-inserted brazing rings are
applicable only to pipe fittings. Brazed joints shall be constructed to permit ultrasonic inspection.
3.4 Construction. Sample coolers shall be shell and coil construction, with sample water passed through the
coil, and coolant (either seawater or chilled fresh water) passed through the shell (see 6.2).
3.4.1 Space. Unless otherwise specified (see 6.2), sample water coolers (including external fittings) shall fit a
space envelope 26 inches in length and 8 inches square in cross-section (see figure 1).
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business